LAYER OF STONE 225th September land is ready for 1st layer of stone, which has been delivered and spread over area for concrete base.

 

 

 

 

 

 

29th September after shuttering is complete the base is ready for concrete pouring, this has been finished off with a polished look to provide an even finish for floor of building.

BASE AND ROAD

3rd October, second part of the concrete begins providing an entrance into the car park. The finish is rippled to provide grip in winter conditions.